SDRS™ Installation

Click to enlarge photos

SDRS™ tubes are manufactured in one of our four facilities to fit the specific height and length of each project.


Site excavation to obtain the patented 3:1 slope is followed by the deployment of filter cloth.  

The patented strap restraint system is attached to the filter cloth and anchored.

PVC pipes are inserted through the straps and SDRS™ tubes. These pipes are used for filling the tubes with sand.

Caledon Shores SDRS™ project prior to covering with sand.


Caledon Shores SDRS™ project 14 years after completion.


Copyright © 2006 Advanced Coastal Technologies