SDRS™ tubes are manufactured in one of our
four facilities to fit the specific height and length
of each project.
|

Site excavation to obtain the patented 3:1 slope is followed by the deployment of filter cloth. |

The patented strap restraint system is attached
to the filter cloth and anchored. |

PVC pipes are inserted through the straps and
SDRS™ tubes. These pipes are used for filling
the tubes with sand. |

Caledon Shores SDRS™ project prior to
covering with sand. |

Caledon Shores SDRS™ project 14 years
after completion.
|